If you are using resource planning up to Vertec 6.5 and want to update to resource planning 6.6, please note the following points in this article.
In resource planning from Vertec 6.6, only one Planning Interval can be planned: day, week or month.
The first time version 6.6 is launched, all existing resource planning data will be recalculated. Therefore, it is important that the desired scheduling interval is selected in the system settings prior to the update so that the resource planning data will be recalculated correctly.
In the new resource planning, planning can only be done at one Planning Level : project or phase (planning level phase only available with module budget & phase).
If previously planned on both levels, some of the data will no longer be visible after the upgrade (e.g. if you set planning level to project, all planned values on phases will no longer be visible).
To harmonize the planning data, please contact your Vertec advisor before updating.
Excel reports will no longer be delivered and the existing ones will be deactivated.
Configurations are now available to replace these reports with the Resource Planning Views and the Utilization Dimensions . All views of the resource planning can be exported to Excel.
If customer-specific reports exist, they must be deleted manually or retested after the upgrade.
Resource planning from version 6.6 onwards completely dispenses with the previous link types of resource planning:
These link types will be deleted with the update to Vertec 6.6 and thus all associated customizing.
The classes:
will be deleted with the update to Vertec 6.6 and thus all associated customizing.
Show resource plan for detail line
the previous system setting resource plan for detail line (internal name: ShowResourceSubDetail
) will be deleted with the update to Vertec 6.6.
The Resource Planning Level setting on the Settings for projects page will be removed with the update to Vertec 6.6.
If this field is used in self-configured pages, it will remain, but will no longer make any sense. We recommend that you remove this field.
The existing OCL operators for resource planning continue to work, so there is no need to make adjustments to existing customizing.
setresourceplanvalue
Methods on User
, Projects
or Project Phases
.
During the migration, Resource Links that had referenced both a project and a phase are cleaned up. The (redundant) project reference is deleted.