This additional feature provides an example of how to implement fee calculation of engineering services in the field of heating, ventilation, cooling and plumbing (HVAC) in accordance with SIA Standard 108.
Operating mode
Cloud Suite
|ON-PREMISES
Modules
Services & CRM
Budget & Phases
Purchases
Resource Planning
Business Intelligence
The Swiss Association of engineers and Architects (SIA) creates up standards and regulations applicable to the construction and planning sector in Switzerland. One of these regulations is published in Standard 108 and describes recommendations for service agreements and calculation aids for the remuneration of design services. The SIA performance model regulates the life cycle of a building in six phases and twelve sub-phases and defines the services and fees to be provided by engineers for each phase.
This Additional Feature provides an example implementation of SIA Standard 108 based on this order:
Based on certain input parameters, budgets for SIA phases are calculated and fees for engineering services in the HVAC sector are calculated.
The download of the config set can be found here.
Overview
SIA Vorlage wählen
, select the desired template (included) and confirm the selection with OK.
Ja
is confirmed, a building object is additionally created directly (see next point).Ja
directly opens the detail page of the building object. New object positions can be manually created on the building object via right-click or Menu Actions, or a Submission with predefined object positions can be selected from the settings:
Offerte SIA
:
This creates a four-page PDF document with the following information:
In addition, an Activity is created on which the offer is saved.
Based on the amounts on the object lines of the building object, the budgets for the SIA phases are automatically calculated, which ultimately result in the bid sum.
Since the SIA information on the offer is required for the calculation, only those subphases can be calculated automatically, which are on a offer with valid SIA information. The offer should always be assigned to the subphases, not the parent phases.
The subphases represent the sub-phases according to the SIA 108 performance model and are located in the SIA Phases folder. The budgets on the subphases are calculated on the basis of the following parameters:
The percentages of performance are both on the page More info of the individual subphases:
as well as configurable in the overview of the folder SIA Phases:
The subphases appear in the SIA Phases folder due to the activated checkbox SIA Berechnung
.
The phases folder contains the parent phases with the codes 1-6 according to the SIA 108 performance model. Each phase is assigned subphases with the respective matching two-digit codes such as, for example, parent phase 5 Implementation with the subphases 51-53.
Vorlage
. As a result, it will appear in the settings in the Project Templates folder:SIA Berechnung
on the More Info page and enter the corresponding percentages if necessary. Activating the checkbox creates the SIA Phases folder in which the subphases are saved. For a project template to appear as an SIA template for selection, the project must contain at least one subphase with the checkbox activated.
In the folder Settings > Projects > Templates Building Object new building object templates can be created. To do this, select New > Building Object. By right-clicking on the object, the corresponding object positions can now be created:
For each object position a name and a position type (HLKS) can be specified:
Important information before import can be found in the Worth knowing about the additional features article. Config sets modify data in Vertec, which can overwrite existing data.
The exact import process can be found in the Articles about the config sets.
Download the additional feature with the following download link:
Version Requirement | Download |
---|---|
6.7.0.17 | Configset_sia.xml |
The following objects are created by importing the config set:
folder | The following folders are created in the root folder Settings > Projects:
|
User groups |
The users must be User group assigned to the corresponding user group. |
Reports & scripts |
|
Project types | The Project Type Template is created. |
Types of activity | The Type Of Activity Offer is created. |
Types of links |
|
Custom field items | a total of 18 custom Custom Field Items are created. |
Class settings | Class settings and page customizations for the class Quotationoffer ProjectPhasephase Customclass03 and Customclass04. |
Translations | A total of 51 Translations will be created. |