Download the plug-in with the following download link and install it in your Vertec. The exact procedure is in the article Things worth knowing about the plug-ins described.
Version | description | Download |
---|---|---|
6.6.0.4 | Uses features from version 6.6.0.4. |
ConfigSet_RessourcePlanningUserPhaseLinks.xml |
As an alternative to normal Resource Planning, the assignment of users to the phases (so-called Editor phase links ) are planned.
This plug-in created in the system settings
under Resource Planning, the Resource Planning type property with conversion from Standard
on Bearbeiter-Phasen-Zuordnung
.
Resource Planning is then based on the assignment of users to phases:
StartDatum
and EndDatum
.StartDatum
and EndDatum
on project phases take into account the information of all operator assignments, analogous to the activity assignments.StartDatum
and EndDatum
on the phase can be overwritten by individual information on the editor-phase link. However, a start and end date must be specified.An effort budget is set on the assignment of an user to a phase. In this example, Lars Sorenson is scheduled for 120 hours for the concept phase from 01.11.2022 – 22.03.2023 and Judith Feller is scheduled for 100 hours in the individual period from 09.01. – 10.02.2023.
In the Resource Planning view, you can see the distribution on the phase:
The following rules apply:
Importing the plug-in creates the following objects:
System settings Resource Planning | Selection of the type of Resource Planning:
|
Scripts |
|
Link types |
|